Large Ducted Systems
Sales
Service
Installation
Repairs

Large ducted systems deliver high-capacity cooling and heating across substantial commercial spaces.

One centralised system provides consistent temperature control throughout your entire facility, eliminating the need for multiple smaller units.

Large systems work best when:

  • Warehouses and distribution centres
  • Manufacturing facilities and production floors
  • Large retail spaces and showrooms
  • Industrial workshops
  • Commercial storage facilities
  • Open-plan office buildings over 400 square meters

Large ducted systems need substantial ceiling space for high-capacity ductwork and equipment. We assess your facility’s structure, calculate cooling loads based on your space and usage, and design the system to deliver proper airflow across all areas.

Installation gets coordinated around your operations to minimise disruption. For facilities that can’t shut down, we stage the work in sections so you can keep operating.

We install, service, and repair large ducted systems across Sydney and regional NSW for warehouses, industrial facilities, and large commercial spaces that need high-capacity climate control. We work fast without cutting corners on the installation quality.

Why Choose JDR Group?

15+ years of commercial and industrial experience
Fully compliant installations across all three trades
Faster response, reduced downtime, lower long-term costs
One team for HVAC, Refrigeration, and Electrical
1-year warranty on all parts
Local reliability and 24/7 support

Sydney’s most trusted commercial and industrial contractor for HVAC, Electrical, and Refrigeration. Wherever you operate in Sydney, our fast response times and full scope capability provide the one-stop solution your business needs. 

HIGH-CAPACITY DUCTED SYSTEMS FOR LARGE COMMERCIAL AND INDUSTRIAL FACILITIES
Click below to learn more
Multi Split Systems
Multi Split Systems
Slimline Ducted Systems
Slimline Ducted Systems
Bulkhead Ducted Systems
Bulkhead Ducted Systems
Large Ducted Systems
Large Ducted Systems
Rooftop Packaged Ducted Systems
Rooftop Packaged Ducted Systems
VRV/VRF Heat Pump/Recovery
VRV/VRF Heat Pump/Recovery
In order to bring some of Sydney’s leading commercial refrigeration systems, JDR Group partners itself with only the world’s leading names in commercial refrigeration. Some of the brands that we’re partnered with include:
What Our Clients Have Said
"Professional service from the initial contact to the end repair. They worked quickly to ensure my commercial refrigerator was fixed so I didn't lose perishable food items. Extremely grateful for their efficiency and highly recommend!"
Loretta Castronovo
"Replacement water pump. Jim arrived within 4hrs of calling, ordered the replacement and his team did a great job in installing it, This was despite the challenges in getting it to an awkward location in the first place."
Tom Edmonds
"Amazing service, came out immediately on a weekend. Saved our day!"
Frenchy's Cafe
"Great team, neat work. 10/10 recommend."
Murray Eden
FREQUENTLY ASKED QUESTIONS
What size commercial property needs a large ducted system?

Answer

Typically, facilities over 400 square meters, including warehouses, manufacturing plants, large retail spaces, and industrial buildings. We calculate the exact capacity based on your space size, ceiling height, insulation, usage patterns, and heat-generating equipment.

Can large ducted systems be zoned for different temperature requirements?

Answer

Yes, we install zoning controls so different areas can be heated or cooled independently. This works well for warehouses with office sections, facilities with varying production requirements, or any space where different zones need different temperatures.

How much ceiling space do large ducted systems require?

Answer

Generally, 600mm or more for main trunk lines and equipment housing. High-capacity ductwork needs substantial ceiling voids. We assess your ceiling structure during consultation to confirm if adequate space exists or can be created.

Are large ducted systems more efficient than running multiple smaller units?

Answer

Usually, yes. One properly sized large system typically operates more efficiently than multiple smaller units running independently. Efficiency depends on correct sizing, quality installation, and regular maintenance.

How long does installation for a large ducted system take?

Answer

It depends on facility size and complexity. Smaller installations might take a few days, while large industrial facilities can take several weeks. We provide realistic timeframes during assessment and coordinate work around your operations where possible.

Can large ducted systems handle extreme heat in industrial environments?

Answer

Yes, when properly sized and designed. We factor in heat-generating equipment, building insulation, and operational conditions when calculating capacity. Industrial facilities often need larger systems than standard commercial spaces of the same size.